Completed complex of works on unloading of the reactors, Angarsk

DESCRIPTION:

Completed complex of works on unloading of two left reactors (out of 4) of hydrotreating diesel fuels, transportation on the territory of OJSC "Angarsk Petrochemical Company", Angarsk, Irkutsk region.

Also in the range of activities included scrolling of equipment around its axis in accordance with project of production of works and installation in the design position. The works were carried out in the shortest possible time.

Within the project has been unloaded, transported and installed the four units of equipment.

Size and weight specifications: Length 34 m, diameter 3.6 m, weight 340 tons.