the Project consisted of 5 main parts:

  1. Acceptance of all parts of wind turbines in the port of Vladivostok (production of Japanese company Kamai)
    In the port of Vladivostok was made to unload all of the parts of wind turbines and their customs clearance.
  2. transportation of wind turbines on the Vladivostok-Yakutsk route, 18 units of equipment were involved, the delivery lasted 2.5 weeks.
  3. loading of wind turbines in the port of Yakutsk and delivery by river transport to the port of Tiksi.
    It was carried out loading of all parts of the wind power plant as well as crane and automotive equipment in the port of Yakutsk for 2 bunker-type vessels.
  4. Unloading at the port of Tiksi and delivery of wind turbines to the installation sites.
    In the port of Tiksi were unloaded all parts of the wind turbine, together with automotive and crane equipment.
  5. installation of wind turbines
    Installation is done by 2 mechanisms crane head crane Liebherr LTM 1200, g/p 200 tons. as well as an auxiliary crane Tadano g / n 50 tons.