• Home
  • Linear production dispatcher station Steel Horse

Linear production dispatcher station Steel Horse

Object:

"lods Steel Horse" Orel

work:

the Installation of two tanks fire protection water supply of 3,000 cubic meters.

Fabrication and erection of cable racks.

the Mounting block box of KTP and connecting with pnrm.